Flat roof replacement, with the wet material actually removed
The temptation on a failing flat roof is to cover it and move on. If there is water in the insulation, covering it is the most expensive thing you can do.

We cut cores first

A core cut pulls a small plug through the whole assembly so we can see the membrane, the insulation and the deck. It tells us whether the insulation is dry, whether there is more than one existing roof up there, and what shape the deck is in.
It takes a few minutes and it is the difference between an informed recommendation and a guess. Anyone quoting a flat roof replacement without looking inside the assembly is quoting blind.
What replacement involves
Tear off to a sound deck, repair or replace deteriorated decking, install insulation to the specified R value with tapered where drainage requires it, install a cover board, then the membrane and all the perimeter and penetration detailing.
The cover board is a piece people cut to save money.
The cover board is a piece people cut to save money. It is what protects the membrane from the insulation below and takes foot traffic. We would rather keep it.
Timing and weather
We do not open more roof than we can dry in a day. In North Texas spring that discipline matters, because a storm can build in an afternoon. Phasing costs a little efficiency and prevents the disaster of an open deck in a downpour.
What North Texas weather does to a roof

We are in the hail belt, and it is not a marketing line. Spring storms come through most years somewhere in the metroplex, and the roofs we replace are usually not worn out from age. They are worn out from one bad afternoon in May.
Wind is the other half. Gusts lift shingles at the seal strip and fold them back. They often lay right back down looking completely normal from the ground, but the seal is broken and the shingle now has a crease through it. Finding those takes somebody lifting tabs by hand.
Wind is the other half.
Then there is the heat. A dark roof in a Texas August runs extremely hot, and an attic without adequate ventilation cooks the shingles from underneath. Roofs here age faster than the number printed on the wrapper suggests, and poor ventilation is a quiet reason why.
What goes on under the shingles
Underlayment goes over the deck. Synthetic underlayment outperforms old felt in both tear resistance and how it handles being left exposed if weather interrupts a job. In the valleys and around penetrations we use a self adhering leak barrier, because those are the places water actually concentrates.
Then the details. New pipe boots every time, because the rubber collar on the old one splits from UV in ten to fifteen years here and drips into the ceiling below long before the field of the roof is worn out. Step flashing where the roof meets a wall, properly woven into the courses rather than smeared with sealant. Drip edge at the eaves and rakes. Ridge ventilation sized for the attic.
Then the details.
Decking gets inspected once the old roof is off. Soft or delaminated sheets get replaced rather than shingled over, and we will show you the picture of what we found. Older homes around here frequently have plank decking rather than plywood, which changes how the job goes and is worth knowing about in advance.
What to ask any roofer, including us

Ask for proof of insurance, and ask them to send the certificate rather than describing it. Ask specifically what underlayment and what shingle line they are quoting, by name, and whether the shingle is impact rated. A quote that just says architectural shingles is not a quote you can compare against anything.
Ask whether they are replacing pipe boots and flashings or reusing them. Ask what happens if they find rotten decking and what it costs per sheet, so it is not a surprise mid job.
Ask whether they are replacing pipe boots and flashings or reusing them.
Ask where their office is and how long they have been in Texas. After a big storm this area fills with crews who follow weather, sell hard for a season and leave. Ask who answers the phone in three years when you have a warranty question.
The work
Jobs like this one





Scroll sideways through the work
Questions about flat roof replacement
How do I know if my insulation is wet?
Core cuts, and on larger roofs an infrared survey can map wet areas. Soft spots underfoot and persistent interior stains are also strong hints.
Can I recover instead of tearing off?
If the assembly is dry and code allows the additional layer, yes, and it saves money. If it is wet, no. We will show you the cores.
How long does it take?
Depends on square footage and detailing. We will give you a phased schedule up front and tell you which sections are affected when.
Will my business have to close?
Almost never. We work around occupied buildings routinely and coordinate noisy work with your schedule where we can.
What about my rooftop units?
They get new curb flashings as part of the work. If a unit needs lifting we coordinate with your mechanical contractor.
Related
Other flat work we do
Scroll sideways for related services
See everything we do, browse finished jobs, or check where we work.
What people say
From customers
We had a great experience with Seth and his team at Ovation Roofing. They were professional, honest, and very easy to work with throughout the entire process. Communication was clear, the work was done on schedule, and the quality of the roof looks fantastic. It’s refreshing to work with a company that does what they say they’ll do. I would absolutely recommend Ovation Roofing to anyone needing roofing work.
Roof replacement customer
Seth came out and checked on our roof and was super kind, quick and efficient. He was very knowledgeable and thorough with explaining exactly what we needed to do and what the process would look like. I had a lot of questions and he answered all of them and made sure I understood the process. I had another quote from a different company and this was a completely different experience.
Homeowner, DFW
Get in touch
Get a straight answer on your roof
Call and you get Seth or someone on his crew, not a call center. We will come out, get on the roof, take pictures, and tell you what we actually see across North Texas, including when the honest answer is that your roof’s got years left in it.
- Phone
817-789-0884 - Email
office@ovationroofs.com - Based in
Haslet, TX - Hours
Mon-Fri 8am-8pm
Sat 8am-4pm
Sun closed